Tuesday 19 November 2019

IEC 62067 FREE DOWNLOAD

The main insulation is cross-linked under high pressure and temperature. The service life has many years of experience and investigation of a cable is defined as its operating time. Some frequently used standards are: The cable core consists of the and terminations installed. IEC Electric cables — Calculation of the current rating. Equipment required Based on the overall capacitance and other parameters of the hybrid transmission cable system, Kinectrics engineers determined the following equipment was required to achieve the requested testing: iec 62067

Uploader: Malarr
Date Added: 17 September 2018
File Size: 56.10 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 3871
Price: Free* [*Free Regsitration Required]





Log In Sign Up.

Rated line-to-line voltage

The conductor of high voltage cables can be made of copper or aluminium and is either round stranded of single wires or iwc segmented in order to to reduce the current losses. These three insulation layers are extruded in one process.

By Muhamad Bin Kasman. It can be optionally equipped with fibers for temperature monitoring.

Cableizer - Parameter

Skip to main content. Cable selection process This broad product range together with a application.

iec 62067

European Committee for Electrotechnical Standardisation. A large utility in Europe requested the commissioning and diagnostic testing of a hybrid transmission cable system 3 cables land and subsea over 40 km in length rated at kV kV phase to phase terminated between a transmission substation to a remote Gas Insulated Substation GIS mounted on an offshore platform. The Six 6 Resonance Test System network with the additional exciting transformer was assembled by Kinectrics engineers and technicians at the remote transmission substation.

In addition, at the remote platform termination on the GIS approximately 40 km offshore, Kinectrics used a real-time Partial Discharge monitoring system to record and diagnose PD activity on each of the 3 cables using local 4G LTE network.

Kinectrics engineers and technicians installed the daisy-chained partial discharge monitoring devices on each of the land cable section joints connected via the preinstalled multimode optical fiber cables. Cables can offer a broad range of both XLPE cables up to kV and oil-filled cables up to kV as well as their accessories. It is together with extensive experience in the field of influenced by the applied materials, the cable systems gained over the years. The cable system passed the required testing and was reported fit for service.

Kinectrics successfully completed commissioning the AC Hi-Pot test with partial discharge diagnosis on a kV hybrid cable system Land and Subsea terminated at a GIS on a platform approximately 40 km offshore.

Test methods and requirements. Based on the overall capacitance and other parameters of the hybrid transmission cable system, Kinectrics engineers determined the following equipment was required to achieve the requested testing: Remember me on this computer.

Standards Catalogue

Electric Cables Handbook 3rd ed - C. During the commissioning testing, 662067 monitored and recorded the partial discharge activity on all the land cable section joints and terminations onshore at the substation end, and at the platform GIS 40km offshore.

Since then production and material technology have improved significantly, providing reliable and maintenance-free products to the utility industry. IEC Common test methods for insulating and sheathing materials of electric cables. Cable systems are equipped with accessories, which have passed the relevant type tests pursuant to national and international standards, such as long-duration tests.

Single-end bonding or Cross-bonding Values apply for cables with rated voltages from kV to kV acc. The metallic sheath shall carry the short-circuit current in case of failure. Equipment required Based on the overall capacitance and other parameters of the hybrid transmission cable system, Kinectrics engineers determined the following equipment was required to achieve the requested testing: Perform Partial Discharge Diagnostic testing on the cable accessories including joints for the onshore cable section and terminations both onshore and offshore.

Help Center Find new research papers in: HD is completed with a number of parts and subsections for different cables intended to be used under special conditions which can vary nationally in Europe.

Click here to sign up. Transmission Cable Commissioning and Diagnostic Testing - Land and Subsea Providing comprehensive testing services to meet diverse customer requirements.

Transmission Cable Commissioning and Diagnostic Testing - Land and Subsea

IEC Electric cables — Calculation of the current rating. IEC Calculation of the cyclic and emergency current rating of cables.

iec 62067

Testing requirement Perform commissioning testing in compliance with IEC standards at 1. Special features in design may occur depending on national conditions. Some of these are listed below.

No comments:

Post a Comment